Chislehurst

Countryside Group Ltd - Chislehurst

Summary

This project truly showcases the power of teamwork and dedication. Our team was tasked with fabricating and installing 1.1m high bow topped railings with 12mm solid bar infill, powder coated in Black. The challenge was to create a railing that would match the slope of the fire exit area. Our team worked together to create a customised solution that perfectly matched the area. In addition to the railing, we also installed bow-topped gates that perfectly matched the railings.

Our fencing team also supplied and installed 250m of 1.8m high timber close board fencing and gates. The client had a specific requirement of hiding the unsightly sheet piled retaining wall, and we were more than happy to assist them. We helped the client by welding the fabricated brackets in situ used to bolt the timber post to the retaining wall, and then installed 2.4m high close board fencing. This not just hid the wall, but also reduced its height. The result was a stunning and functional fencing solution that exceeded the client's expectations.

This project is a testament to our team's expertise, dedication, and ability to deliver outstanding results. We take pride in our ability to work together and create customized solutions that meet the unique requirements of our clients.

Location

2022

Chileshurst

Completion Year

Countryside Group Ltd - Chislehurst
Countryside Group Ltd - Chislehurst

CALL OUR FRIENDLY TEAM: 01233 510699

  • LinkedIn
  • Facebook
  • Instagram
  • Twitter
bottom of page